|
||||||||||
|
DOI: 10.17587/it.24.618-624 Yu. V. Doronina, Ph. D., Associate Prof., Professor, e-mail: juvao@yandex.ru, The synthesis of a complex system should take into account two aspects: the functional binding of functions to the structural elements of the system and the uncertainty in the functional — structural components during the cycle of operation of this system. Functional binding means that there is a basic relationship between the system elements and the functions inherent in those elements. However, local changes of function bindings to structural elements are possible under certain conditions. The inconsistency of these two aspects can be solved by selecting stable (basic) structural elements with a clear binding of functions, as well as a subset of structural elements with a limited functional binding. The article discusses the task of implementing distributed functionality of the information system. It applied the idea of fuzzy binding functions to the formation of a plan to deal with tasks that require certain resources (functions or services of structural units) of the system. An example of the distribution of functions for the environmental monitoring system is given. P. 618–624 |